Quick Steps To Raising The Soft Top

Refer to “Raising The Soft Top” in this section for further information.

1. Open the swing gate and raise the top, engaging the Sunrider latches (another person may be needed to help with this operation).

2. Engage header latches.

2. Engage header latches.

3. Install rear corner panels.

3. Install rear corner panels.

4. Install side and back windows.

4. Install side and back windows.

Lowering The Soft Top

    See also:

    Programming A Rolling Code
    For programming garage door openers that were manufactured after 1995. These garage door openers can be identified by the “LEARN” or “TRAIN” button located where the hanging antenna is a ...

    RW/FF
    Press and hold FF (Fast Forward) and the CD player will begin to fast forward until FF is released or RW or another CD button is pressed. The RW (Reverse) button works in a similar manner. ...

    Edit Uconnect™ Phonebook Entries
    NOTE: • Editing names in the phonebook is recommended when the vehicle is not in motion. • Automatic downloaded phonebook entries cannot be deleted or edited. • Press the button to begin. ...