Quick Steps To Raising The Soft Top
Refer to “Raising The Soft Top” in this section for further information.
1. Open the swing gate and raise the top, engaging the Sunrider latches (another person may be needed to help with this operation).


2. Engage header latches.

3. Install rear corner panels.

4. Install side and back windows.

See also:
Gross Axle Weight Rating (GAWR)
The GAWR is the maximum permissible load on the front and rear axles. The load
must be distributed in the cargo area so that the GAWR of each axle is not exceeded.
Each axle’s GAWR is determined ...
Smooth, quiet ride
But most people won't get out into the wild with the Unlimited and they'll
enjoy it just the same on the highway. Jeep added a few acoustic improvements to
make the ride quieter, though those are ...
Multifunction Lever
The multifunction lever on the left side of the steering
column controls the operation of the headlights, parking
lights, turn signal lights, instrument panel lights, instrument
panel light dimm ...


