Quick Steps To Raising The Soft Top

Refer to “Raising The Soft Top” in this section for further information.

1. Open the swing gate and raise the top, engaging the Sunrider latches (another person may be needed to help with this operation).

2. Engage header latches.

2. Engage header latches.

3. Install rear corner panels.

3. Install rear corner panels.

4. Install side and back windows.

4. Install side and back windows.

Lowering The Soft Top

    See also:

    Programming A Rolling Code
    For programming garage door openers that were manufactured after 1995. These garage door openers can be identified by the “LEARN” or “TRAIN” button located where the hanging antenna is a ...

    Freeing A Stuck Vehicle
    If the vehicle becomes stuck in snow, sand or mud, it can often be moved by a rocking motion. Move the shift lever rhythmically between DRIVE and REVERSE while applying slight pressure to the ac ...

    Engine
    ...