Quick Steps To Raising The Soft Top

Refer to “Raising The Soft Top” in this section for further information.

1. Open the swing gate and raise the top, engaging the Sunrider latches (another person may be needed to help with this operation).

2. Engage header latches.

2. Engage header latches.

3. Install rear corner panels.

3. Install rear corner panels.

4. Install side and back windows.

4. Install side and back windows.

Lowering The Soft Top

    See also:

    List All Names In The Uconnect™ Phonebook
    • Press the button to begin. • After the “Ready” prompt and the following beep, say “Phonebook List Names”. • The Uconnect™ Phone will play the names of all the phonebook entrie ...

    Fluid Level Check
    Check the fluid level by removing the fill plug. The fluid level should be between the bottom of the fill hole and a point not more than 3/16 in (4.76 mm) below the bottom of the hole. Add fluid, ...

    Towing
    When equipped with the optional towing package, any Liberty can tow 5,000 pounds, just like the outgoing model. Even though that's plenty for this class, I'm a bit surprised Jeep didn't try to bum ...